I have several target servers defined, i have a job that needs to run in a serial fashion (ie.. 1 target at at time) if every target kicks off the job at the same time it's going to bog down the disk drives... can this be serialized? or do i need to write a special routine...

nr
SQLTeam MVY

12543 Posts

Posted - 2007-05-18 : 12:25:51
Why not just run them one after the other? Either different steps in a single job or as a loop for each server.

==========================================
Cursors are useful if you don't know sql.
DTS can be used in a similar way.
Beer is not cold and it isn't fizzy.
Go to Top of Page

lghollow
Starting Member

4 Posts

Posted - 2007-05-18 : 12:57:00
there on different servers, if was going to do it that way then there would be need to enlist any targets. I don't want to deploy this job across the 30+ servers that we have.
Go to Top of Page

rmiao
Master Smack Fu Yak Hacker

7266 Posts

Posted - 2007-05-18 : 14:40:07
Sounds need third party job schedule tool.