Please start any new threads on our new
site at https://forums.sqlteam.com. We've got lots of great SQL Server
experts to answer whatever question you can come up with.
Author |
Topic |
ashish.johri
Starting Member
10 Posts |
Posted - 2007-10-08 : 10:07:06
|
1. There are 2 steps in one job. Even if one is succeed then EXECUTE @IRetval = msdb.dbo.sp_get_composite_job_info @schedule_id = 8 IF (@IRetval <> 0) BEGIN SET @BResult = 0 --Failure END ELSE BEGIN SET @BResult = 1 --Success END gives success. Do I need to create two jobs if I need to address whether all the steps are successful?2. If the job fails then to which table does error code and error description is populated?Regards,Ashish Johri |
|
nr
SQLTeam MVY
12543 Posts |
Posted - 2007-10-08 : 10:56:52
|
Have a look at sysjobhistory and sysjobstephistory==========================================Cursors are useful if you don't know sql.DTS can be used in a similar way.Beer is not cold and it isn't fizzy. |
 |
|
rmiao
Master Smack Fu Yak Hacker
7266 Posts |
Posted - 2007-10-08 : 21:59:05
|
Don't need separate jobs, you can check job step status. |
 |
|
ashish.johri
Starting Member
10 Posts |
Posted - 2007-10-09 : 11:14:34
|
Thanks a lot.Regards,Ashish Johri |
 |
|
|
|
|